Projects |
Bayport Terminal Complex – Bayport Container Terminal Phase I, Phase 1A Wharf Extension, and Review of Freeze Wall Construction on Existing Drilled Shafts – Bayport Terminal Complex Ph. 1A |
Galveston Causeway Bridge CSJ: 0500-01-117 |
Pelican Island and San Jacinto Placement Areas – Land Boring, Task Order #4; URS Corporation |
Core drilling, soil sampling & laboratory testing FY 1991; Galveston, Texas |
Gulf Intracoastal Waterway; Aransas National Wildlife Refuge, TX |
US 82 between Greenville, Mississippi and Lake Village, Arkansas |
Construction of Barge Lanes along Houston-Galveston Navigation Channel |
Marine borings, Boston Harbor proposed outfall diffusers & tunnel alig; Boston, Massachusetts |
Core drilling, soil sampling & laboratory testing of soil; Galveston, Texas |
Proposed Slope stability Analysis of the Proposed Configuration by Zachary for the Port of Houston Authority |
Core drilling, soil sampling & laboratory testing; 3 year open-end con; Galveston District, Texas |
Core drilling, sampling and laboratory testing 5 Year Contract; Galveston District, Texas |