Public Infrastructure (PI)

  • water and wastewater systems, including distribution/collection and treatment/handling
  • surface and ground water conveyance facilities
  • intake structures
  •  water storage tanks
  • sanitary sewer and storm sewer lines/force mains
  • treatment plants, pumping stations and booster pumps
  • lift stations
  • paving and drainage for city and county streets and thorough-fares, and rural roadways
  • bridges
  • public parks/trails
Projects
Coastal Water Authority (CWA) Luce Bayou Interbasin Transfer Proj. (LBITP)
Huntington Village Section 4 Area Paving and Drainage; WBS No. N-210006-0001-3; Houston, Texas
GCWA – Alta Loma Water Transmission Main Improvements – Highway 6; Hitchcock, Texas
City of Pearland Surface Water Treatment Plant (Project #WA1605) – Package 1 and 2; City of Pearland, Texas
NEWPP-Component 1; COH WBS No. S-000065-002-3; Houston Waterworks Team
Raccoon Drive Lift Station 24″ Force Main Project
Proposed Water Treatment Plant – Far Northeast Harris County
Ground Stabilization along 11th Street & Almeda Tunnels
SJRA GRP Program Surface Water Facilities and Treated Surface Water Transmission System
Northeast Water Purification Plant Phase I, HAWC (Montgomery Watson)
City of Houston 84-inch Water Line Interconnection at East Water Purification Plant
Capers Ridge Pump Station and Dual 96-inch Pipelines – Coastal Water Authority (CWA)
SJRA East Canal Transfer Pump Station Project, Conroe, Texas/San Jacinto River Authority
SJRA East Canal Transfer Pump Station Project, Conroe, Texas/San Jacinto River Authority
WHCRWA Contracts 12, 14A and 19A, Houston, Texas; West Harris County Regional Water Authority
NFBWA Segment 3, 7B and 8, Fort Bend County, Texas; North Fort Bend Water Authority
Northwest Sludge Transfer System
Mangum Road Relief Sewer
East Water Program
Fulton North Waterline Replacement Project