| Projects |
| Coastal Water Authority (CWA) Luce Bayou Interbasin Transfer Proj. (LBITP) |
| Huntington Village Section 4 Area Paving and Drainage; WBS No. N-210006-0001-3; Houston, Texas |
| GCWA – Alta Loma Water Transmission Main Improvements – Highway 6; Hitchcock, Texas |
| City of Pearland Surface Water Treatment Plant (Project #WA1605) – Package 1 and 2; City of Pearland, Texas |
| NEWPP-Component 1; COH WBS No. S-000065-002-3; Houston Waterworks Team |
| Raccoon Drive Lift Station 24″ Force Main Project |
| Proposed Water Treatment Plant – Far Northeast Harris County |
| Ground Stabilization along 11th Street & Almeda Tunnels |
| SJRA GRP Program Surface Water Facilities and Treated Surface Water Transmission System |
| Northeast Water Purification Plant Phase I, HAWC (Montgomery Watson) |
| City of Houston 84-inch Water Line Interconnection at East Water Purification Plant |
| Capers Ridge Pump Station and Dual 96-inch Pipelines – Coastal Water Authority (CWA) |
| SJRA East Canal Transfer Pump Station Project, Conroe, Texas/San Jacinto River Authority |
| SJRA East Canal Transfer Pump Station Project, Conroe, Texas/San Jacinto River Authority |
| WHCRWA Contracts 12, 14A and 19A, Houston, Texas; West Harris County Regional Water Authority |
| NFBWA Segment 3, 7B and 8, Fort Bend County, Texas; North Fort Bend Water Authority |
| Northwest Sludge Transfer System |
| Mangum Road Relief Sewer |
| East Water Program |
| Fulton North Waterline Replacement Project |